Control measurement of the photovoltaic (PV) power plant production is the most exact method of verifying its real production and production efficiency.
The performance ratio test (PR test) is an important control indicator of the correct production of the PV power plant. Based on direct and independent measurement at the location, we will determine the real potential of your PV power plant to transform the energy of actually falling solar radiation into the corresponding quantity of electric power.
You will obtain:
The client – a company doing business in the power industry in the Czech Republic – had a photovoltaic (PV) power plant built in the south of Moravia with the installed output of 1.7 MWp. Before taking over the work from the general contractor the client had to make sure that the power plant production corresponded with the production parameters...